Laserfiche WebLink
June 18,1990 <br /> Monday <br /> Day # 11 <br /> Excavation CKC dug a trench running in a NIS direction, four <br /> feet deep and twenty feet long, in the east <br /> excavation The trench was to determine the extent <br /> of clean soil overburden <br /> Confirmatory Eric took confirmatory samples at the bottom and <br /> Sampling sidewalls of the west excavation Samples were <br /> (t picked up by a Sacramento lab selected by Eric <br /> Biocell CKC is spreading the soil at the cell to a level of <br /> 16" <br /> Started the third section of the cell liner To <br /> spread and tape seal liner and geo fabric took <br /> approximately two hours <br /> Started to dump soil on new section around 4 PM <br /> this dirt was place in a way that would hold the <br /> liner in place during the night <br /> - Electrical Spoke with Jim Curtis He has changed the location <br /> Service of the electrical service for the irrigation <br /> system He now wants the service located at the <br /> end of building 40 Also he just wants the power <br /> to be supplied by an extension cord I canceled the <br /> contract arrangement previously made with Collins <br /> Electric <br /> Survey CKC surveyed the west excavation depth <br /> Insurance Bruce called to inform me that the insurance <br /> Change certificates sent to DAW by our subs was in error <br /> The name style should be AMERICAN FOREST PRODUCT <br /> COMPANY L P not DAW I notified subs by mail <br /> Disposal Contacted BFI and Chem Waste regarding the disposal <br /> Profile of the contaminated soil not going to the biocell <br /> Both companies would send application The current <br /> approval turn around time is 4 to 6 weeks <br /> Visitors AM&M Bernie Sloop, Pete and Marvin Palmer were on <br /> site <br /> L <br /> f <br /> I � . <br />