My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008140
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:31:50 PM
Creation date
6/18/2020 12:11:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008140
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 20,1990 <br /> Wednesday <br /> Day # 13 <br /> Safety Eric conducted a safety meeting for all personnel <br /> Meeting Record of meeting in Erics' field notes Items <br /> covered Hot weather condition, straight cut of <br /> Llast portion of excavated area <br /> Excavation Completed the last of the excavation work at the <br /> east area <br /> Additional material was removed from the west <br /> excavation This area had shown high readings in <br /> the laboratory results. <br /> Sampling Eric and myself took the soil samples from the <br /> bottom and sxdewall of the east excavation Also <br /> took another sample from the floor of the west <br /> excavation after removing an additional 4' of soil <br /> Biocell Constructed portions of the cell expansion area <br /> This area will be used to stockpile the remaining <br /> soil overburden which had unacceptable high limits <br /> from lab results <br /> Soil Stockpile Moved the soil stockpile from the excavation area <br /> to the biocell The plastic material used to cover <br /> and as ground cover has mixed into the sous CKC <br /> people are trying to remove as best as possible <br /> Portion of the overburden pile is contaminated and <br /> will have to be taken to the cell for stockpiling <br /> Meeting Met with CKC to discuss extra work items <br /> Drums Continue to empty the drums of soil into the <br /> stockpile area for transportation the Biocell <br />
The URL can be used to link to this page
Your browser does not support the video tag.