Laserfiche WebLink
June 27,1990 <br /> Wednesday <br /> Day # 18 <br /> Backfill West excavation filled within two feet of final <br /> grade CKC began to fill east excavation CKC <br /> exchanged the sheep foot compactor for a smaller <br /> unit The sand was tested for compaction by AIM the <br /> results were 92% <br /> Biocell Watered the cell area for period of one hour Timer <br /> is not operable water by manual overriding <br />' automatic valve <br />