My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008140
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:31:50 PM
Creation date
6/18/2020 12:11:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008140
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 28,1990 <br /> Thursday <br /> Day # 19 <br /> Backfilling Continue backfilling of East excavation Compaction <br /> test are averaging 95% AIM is testing every lift <br /> the lift are in 12" layers Last day of continues <br /> L soils testing Will have AIM return on Monday to <br /> spot check base rock compaction <br /> Biocell Measured the final main cell and expansion cell <br />' Measurement Main cell was modified to fit the last plastic <br /> liner run The liner would not stretch <br /> Main cell as built dimensions is 215'x 1751 , filled <br />' to 18" level equalling 2090 CY <br /> Expansion cell dimensions are connecting link <br /> 36'x 8' expansion 77'x 78' filled to 24" level <br />' equalling 467 CY <br /> Biocell Manually turned water on at cell Water for a one <br /> Irrigation hour period The is some puddling of the water at <br />' the low spots on the cell The cell has natural <br /> fall towards the south/east corner <br />' Irrigation Dave Christen said that the 2 x 4 ramp that our <br /> Piping contractor built over the 4" line crossing the <br /> driveway, was already broken Dave asked if we <br /> could pave over the pipe I told him that we could <br /> do this work when the other paving work was done on <br /> une 9th <br /> Equipment CKC removed there excavator equipment today <br /> Remaining equipment is the water truck, loader and <br /> small compactor <br /> Debris Bin Waste management picked up the 20 yard bin filled <br /> with miscellaneous debris generated from the <br /> biocell and the excavation work <br />' Sub Grade Work CKC, using loader to remove native materials from <br /> area to be paved The material is the same as the <br />' over burden The plan is to scrape the top surface <br /> down to sub grade This top material will be push <br /> into excavation as fill Do not want have excess <br /> material to be handled at the end of the fob <br />
The URL can be used to link to this page
Your browser does not support the video tag.