Laserfiche WebLink
Proposal—Additional rechnical Service <br /> Installing two soil bonngs and collecting 5 soil samples from each boring This task will <br /> occur in August 2001 and will include submission of a Work Plan for the proposed work, <br /> and <br /> Preparing a Ficial Report (draft and final) presenting the results of the groundwater <br /> monitoring and comparison of the soil sample results relative to results obtained in 1995 at <br /> the same locations <br /> 1 1 TASK 1 GROUNDWATER MONITORING <br /> Groundwater monitoring will be conducted at this site on a semi-annual basis for five years <br /> Proposed work includes taking water level measurements, collecting water samples to be submitted for <br /> TPH-d analysts and evaluating the groundwater flow directions and the analytical results Dames & <br /> Moore will provide a beef summary letter(1n draft and final form) to Kirkland & Ellis following each <br /> monitoring or sampling activity (1 a twice per year) Each summary letter will bn:ily describe the <br /> work performed at the Site and the status of the project schedule and budget as described in <br /> . Section 1 2 an annual report will be prepared to present the groundwater morutonng data <br /> Depth to groundwater will be measured in flit five wells in lanuary and July each year <br /> Groundwater samples will be collected 1n July and analyzed for TPH-d by EPA Method 8015M Prior <br /> to sample collection, the wells will be purged of at Icast three casing volumes Purging will continue <br /> until field parameters(pH, temperature, and conductivity)stabilize Purge water will be contained in <br /> a tank mounted on the sampling vehicle and transferred to a polypropylene tank for on-sr.e storage <br /> pending the results of the analysis and selection of appropriate disposal procedures No estimated <br /> disposal cost is included in our estimated charges for this project, as it possible that there will be no <br /> disposal charge (the purge water can be discharged to pavement at the site if no elevated levels of <br /> chemicals are present) <br /> 1 2 TASK 2 ANNUAL REPORTING AND PROJECT SUPPORT <br /> A Letter Report presenting the analytical results will be submitted by the end of ALugust each <br /> year or for 1996 within 30 days from the completion of sample collection activities The report will <br /> present tabular summaries of measured groundwater levels and reported laboratory analytical results <br /> A draft copy of the letter report will be submitted to Kirkland & Ellis for review Commenu will be <br /> incorporated before subrmaing the final letter report Damcs&Moore is also atlocatir¢ 4 hours per year <br /> R+sAC%erumveoe w wro Page 2 <br /> DAmts & Moolm <br />