My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008213
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:53:26 PM
Creation date
6/18/2020 12:16:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008213
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Glass wool. <br /> 7. Oxygen regulators. <br /> 8. Mechanical stirrer. <br /> 9. Stirring bar. <br /> 10. Combustion tube, hydrocarbon (Leco number 519--004). <br /> 11. Hot plate. <br /> 12. Balance, can be read to 0.001 g. <br /> 3.2.4.5 Procedure (revised and updated from Smith et al., 1974)-- <br /> NOTE: <br /> 970-- <br /> NOTE: Read entire manuals on Leco Furnace, Automatic Titrator and this <br /> entire procedure before starting. <br /> 1. Place one level scoop of iron chips in crucible. <br /> 2. Weigh 0.500 g of sample (less than 60 mesh) into the crucible. <br /> NOTE: For samples that are suspected to contain over 1% sulfur or have a <br /> 40 chroma of less than 2, see 3.2.4.2. - - <br /> 3. Add one scoop MgO. <br /> 4. Add one copper ring and then one scoop of iron powder. • <br /> 5. Gently shake the crucible to evenly cover the bottom and place one <br /> porous cover on the crucible. <br /> T - �6:Turn on "Filament Voltage" grid tap to medium position. <br /> ?. Wait for one minute then turn "High Voltage" switch to ON. <br /> -- 8. Set "Titrate-Endpoint" switch to its middle position. - -- - -� - - -- — --- T -� <br /> 9. Turn on titrator (upper left switch above "Endpoint Adjust"). <br /> 10. Drain "Titration Vessel" completely. <br /> 11. Set timer switch to ON, adjust timer to 10 minutes, or a time <br /> sufficient to satisfy steps 25, 26, and 27. <br /> 12. Slosh carboys containing HC1 and K103 to mix the condensate on the <br /> walls of the container. <br /> 3 <br /> J 13. Fill "iodate Buret." <br /> 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.