My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008224
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 1:10:23 PM
Creation date
6/18/2020 12:22:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008224
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the PHS/EHD requested that-�fonal-monitoring be conducted before closure would be <br /> reconsidered <br /> 1.2 Purpose <br /> The purpose of this report is to document groundwater monitoring activities conducted at <br /> the Site during the fourth quarter of 2001 The primary objective of the monitoring is to <br /> assess changes in groundwater levels and concentrations of TPH-D in groundwater at the <br /> Site The scope of work was expanded to include the analysis of groundwater samples <br /> for volatile organic compounds (VOCs) and fuel additives using EPA Method 826013, in <br /> accordance with a verbal instruction from the PHS/EHD on November 14, 2001 <br /> 1 <br /> 1.3 Scope of Work <br /> Monitoring activities conducted during the fourth quarter of 2001 included the following <br /> activities <br /> • Measurement of water levels in all seven monitoring wells on December 12, 2001, <br /> + Sampling of groundwater in seven monitoring wells (DMW-1 through DM-7), <br /> • Analysis of groundwater samples for TPH-D using method 8015M, and <br /> • Analysis of groundwater samples for VOCs and fuel additives using method 8260B <br /> 2.0 FIELD AND LABORATORY PROCEDURES <br /> This section provides a summary of the field and laboratory procedures used during the <br /> fourth quarter 2001 monitoring event <br /> 2.1 Sampling Methods And Procedures <br /> Groundwater samples were collected by URS on December 12, 2001 Field records of <br /> sampling are attached in Appendix A Prior to sampling, the static water level was <br />' measured using an electric water level indicator Groundwater samples were collected <br /> from all seven monitoring wells <br /> 3 K\saoi9\AFTN4QOt-rpt doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.