Laserfiche WebLink
Are the visual and audible alarms operational? <br />Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br />functionally tested, and confirmed operational? <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proper operation? <br />Was monitoring system set-up reviewed to ensure proper settings? <br />functionally tested, and confirmed operational? <br />Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? <br />Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br />disconnected? <br />Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br />Which sensors initiate positive shut down? (Check all that apply.)Sump Under-dispenser containment <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br />Check this box if tank gauging equipment is installed.(Do not complete this section.) <br />Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testin g for ground <br />faults? <br />Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, <br />and confirmed operational? <br />Was a <br />Were all probes reinstalled properly?