Laserfiche WebLink
� T <br /> PRIVIIED &CONFIDENTIAL <br /> 8.0 WASTE DISPOSAL <br /> The soil cuttings and wastewater produced during the well abandonment activities will be <br /> L <br /> placed in 55-gallon DOT-approved drums and stored on-site pending their disposal. The <br /> soil cuttings and wastewater will then be transported off-site to ,a disposal/recycling <br /> facility by a licensed hauler.in accordance with appropriate regulations. Well casing, well <br /> L <br /> boxes and concrete debris will be transported off-site to a sanitary landfill. <br /> 9.0 SCHEDULE <br /> ]r,, Following the approval of this work plan by the SJCEHD, we estimate the schedule for <br /> completing the installation and sampling of the groundwater monitoring wells to be as <br /> follows: <br /> 4 WEEKS <br /> 0 1 2 3 4 <br /> Project Coordination and Permitting 00000 <br /> L Groundwater Monitoring Well Destruction 00 <br /> Report 00 <br /> ' 10. REPORT AUTHORS <br /> Building Analytics <br /> 528 State Street <br /> ' Glendale, California 91203 <br /> L <br /> t <br /> Prepared b : <br /> P Y <br /> Russell M. Cote, M.Sc. <br /> Staff Geologist <br /> Approved by: <br /> 2serbnfoa, .E.G., .HG. <br /> Maner, vironmental Services <br /> f <br /> 1 1 <br /> t <br /> L <br /> L7 199164—WFB.Stockton Well Abandonment Work Plan <br />