My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
49
>
2900 - Site Mitigation Program
>
PR0506077
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 4:33:28 PM
Creation date
6/18/2020 4:18:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506077
PE
2950
FACILITY_ID
FA0007187
FACILITY_NAME
WELLS FARGO BANK
STREET_NUMBER
49
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15121034
CURRENT_STATUS
01
SITE_LOCATION
49 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wells Fargo Bank, Stockton Branch <br /> September 6, 1996 <br /> Page 9 <br /> Report Preparation <br /> A final report will be prepared and submitted to Wells Fargo Bank and to the SJCEHD. <br /> The report will document all the aspects of the investigation, the results of the soil and <br /> groundwater sampling and testing, including all QC pilocedures. Permits, boring logs, <br /> monitoring well details, laboratory reports and chain-of-custody documents will be attached <br /> to the report. Additionally, there will be recommendations which may include no further <br /> action, additional investigations or remedial measures and corrective actions based on the <br /> results of these investigations. <br /> C. SCHEDULE <br /> • Two to three weeks -permits and discussions'with SJCEHD <br /> �, • One week - drilling, monitoring well ins itallation, well development and <br /> sampling <br /> • Two weeks -Laboratory analyses <br /> L • One to two weeks - Report <br /> D. COST ESTIMATE <br /> - Building Analytics Prefield <br /> H&S Plan $180 <br /> Mark Boring Locations 450 <br /> Obtain Permits 400 <br /> t <br /> Utility <br /> Geophysical Survey $2,200 <br /> USA No charge <br /> Private Utility locators 400 <br /> Building Analytics Field Cost(Installation of Mws) <br /> r Travel $400 <br /> L Field work 1,200 <br /> Field equipment 600 <br /> Building Analytics Field Cost(Well Development) <br /> Travel $400 <br /> Field work 800 <br /> Field equipment 400 <br /> Drilling Subcontractor <br /> Mobilization $905 <br /> Drill, sample and install three, <br /> 4" monitoring wells 40 depths <br /> of 70/A bgs. Soil sample every 5 feet 9,576 <br /> C21 drums @ $42 per drum 882 <br /> �I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.