Laserfiche WebLink
Wells Fargo Bank, Stockton Branch <br /> September 6, 1996 <br /> Page 9 <br /> Report Preparation <br /> A final report will be prepared and submitted to Wells Fargo Bank and to the SJCEHD. <br /> The report will document all the aspects of the investigation, the results of the soil and <br /> groundwater sampling and testing, including all QC pilocedures. Permits, boring logs, <br /> monitoring well details, laboratory reports and chain-of-custody documents will be attached <br /> to the report. Additionally, there will be recommendations which may include no further <br /> action, additional investigations or remedial measures and corrective actions based on the <br /> results of these investigations. <br /> C. SCHEDULE <br /> • Two to three weeks -permits and discussions'with SJCEHD <br /> �, • One week - drilling, monitoring well ins itallation, well development and <br /> sampling <br /> • Two weeks -Laboratory analyses <br /> L • One to two weeks - Report <br /> D. COST ESTIMATE <br /> - Building Analytics Prefield <br /> H&S Plan $180 <br /> Mark Boring Locations 450 <br /> Obtain Permits 400 <br /> t <br /> Utility <br /> Geophysical Survey $2,200 <br /> USA No charge <br /> Private Utility locators 400 <br /> Building Analytics Field Cost(Installation of Mws) <br /> r Travel $400 <br /> L Field work 1,200 <br /> Field equipment 600 <br /> Building Analytics Field Cost(Well Development) <br /> Travel $400 <br /> Field work 800 <br /> Field equipment 400 <br /> Drilling Subcontractor <br /> Mobilization $905 <br /> Drill, sample and install three, <br /> 4" monitoring wells 40 depths <br /> of 70/A bgs. Soil sample every 5 feet 9,576 <br /> C21 drums @ $42 per drum 882 <br /> �I� <br />