My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 4:50:25 PM
Creation date
6/18/2020 4:26:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Pac c 4 of 6) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> Fsectionust be completed if a monitoring panel is used to perforin leak detection monitoring. Y N NA <br /> vuand audible alarms operational? 21 L [] <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ❑ ❑ <br /> functional) tested and confirmed operational? 141 <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their 0 ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? Q ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? 0 ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ 0 <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ❑ Q <br /> disconnected Ll <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ 0 <br /> Which sensors initiate positive shutdown? (Check all that apply.) L Sum P ❑Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? Q ❑ Q <br /> For anV answer of"N"above describe in section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> V1 Check this box if tank gauging is used only for inventory control. Do not complete this section. <br /> Check this box if NO tank gauging equipment is installed. Do not complete this section. Y N NA <br /> This section must be completed if in-tank-gagging is used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination,including testing for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functionally tested, ❑ ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ 1 ❑ <br /> Were all probes reinstalled properly? ❑ ❑ El <br /> Were all items on the equipment manufacturers maintenance checklist completed? ❑I ❑ I ❑ <br /> For anV answer of"N"above, describe in section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.