Laserfiche WebLink
RE(;tlVtD <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Pacie 5 of s <br /> _ _ XII. LINE LEAK DETECTOR TESTING <br /> Check this box if line leak detectors(LLD)are NOT installed (Do not complete this section) Y' - NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? L2 L1 Ll <br /> all that a f . Simulated leak rate verified: 3 GPH 0.1 GPH 0.2 GPH <br /> Was the testing apparatus properly calibrated? ❑ ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ ❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ ❑ <br /> For any answer of"N"above describe in section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM /PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑.I Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitor(ng. <br /> System Type(Markall that apply.) Vacuum El Pressure n Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> PassFail Pass Fail <br /> EI—P—ass nEaA E 1P-ass Fail <br /> Pass Fail ELPass 0 Fail <br /> Pass Fail LIPass LLFa.1 <br /> Pass Fail LLPass LLFail <br /> Pass Fail LLPass it <br /> Pass Fail LLPass it <br /> Pass Fail LLPass LLFail <br /> Pass Fail LLPass LLFail <br /> Pass nEO PassFail <br /> PassFail PassFail <br /> Pass nEg Pass ElFail <br /> How was interstitial communication verified? Ll Simulated leak at far ends of the interstitials ace. I I Visual Inspection <br /> ❑Other(Describe the method in section XV below.) Gau e <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? L1 Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br />