My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008784
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_XR0008784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:22:27 AM
Creation date
6/22/2020 7:53:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008784
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND ZERO ANALYSIS, INC. <br /> 1714 Main Street <br /> Escalon, California 95320-1927 <br /> Telephone (209)838-9888 <br /> Facsinule (209)838-9883 <br /> January 27, 2003 <br /> Mr Harlin Knoll <br /> i <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Subject Fourth Quarter 2002 Groundwater Monitoring and Sampling Report <br /> Former M&K Market, 8960 West Walnut Grove Rd, Thornton, California <br /> Dear Mr Knoll <br /> • This letter report presents the results of the fourth quarter 2002 groundwater monitoring and <br /> sampling activities at the subject site (Figure 1) The report was prepared by Ground Zero <br /> Analysis, Inc (Ground Zero) on behalf of the Barnyard Corporation <br /> 1.0 SITE ACTIVITIES <br /> Activities at the site included <br /> • Monitoring groundwater levels in site wells, <br /> • Purging and sampling groundwater all site wells, <br /> • Analyzing groundwater samples for benzene, toluene, ethylbenzene, total xylenes (BTEX), 1,2- <br /> dlchloroethane (1,2-DCA), ethylene dibromide (EDB), and oxygenated gasoline additives, <br /> • Collecting an additional soil sample from stockpiled soil, <br /> • Analyzing the composite soil sample for total petroleum hydrocarbons as gasoline (TPHg), total <br /> petroleum hydrocarbons as diesel (TPHd), and BTEX <br /> 2.0 FIELDWORK <br /> 2.1 Additional Well hlstallation and Sampling <br /> Three additional monitoring wells (MW5, MW6, MW7) were installed on October 30, 2002 to <br /> G 1DatalGROUNDZElBarnyard-ManserlReporlslQMR14QM2002 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.