Laserfiche WebLink
1.INTRODUCTION ' <br /> Construction of Phases 1 and 2 is documented in two respective as-built reports <br /> (CH2M HILL,2005 and 2007b). <br /> 1.2.4 Monitoring and Reporting Program <br /> The previous MRP No. R5-2004-0803 was issued on January 30,2004,by the RWQCB. In <br /> addition to monitoring general groundwater conditions, the previous MRP was developed <br /> specifically to monitor the bioremediation pilot test, as described in the Bioremediation Pilot <br /> Study Work Plan(CH2M HILL,2003). The MRP required detailed quarterly groundwater <br /> monitoring, semiannual reports for the first semiannual period (fourth quarter 2006 and first <br /> quarter 2007) and for the second semiannual period (second and third quarters 2007),in <br /> addition to semiannual electronic data reports submitted for the second and fourth quarters. <br /> The current MRP,No. R5-2007-0831,was issued on November 29,2007,by the RWQCB. ' <br /> This MRP was developed to monitor.current Site conditions with NINA and <br /> phytoremediation as remedies. This MRP eliminated most of the parameters added in the <br /> previous MRP to monitor the bioremediation pilot test,eliminated unnecessary monitoring ' <br /> wells and parameters,allowed for the destruction of unnecessary monitoring wells,and <br /> allowed for the destruction of the soil vapor extraction well system. <br /> t <br /> 1-4 ES101214202053SCO <br />