Laserfiche WebLink
1.0 INTRODUCTION <br /> On behalf of LESCO, Inc. (LESCO), ERM-West, Inc. (ERM)has prepared <br /> this Additional Site Characterization and Monitoring Well Installation <br /> Workplan (Workplan) to further investigate shallow soil and groundwater <br /> conditions beneath the LESCO facility located at 2829 and 2835 <br /> Washington Street,in Stockton,San Joaquin County,California (Site). <br /> This Workplan is submitted in response to a request by the Central Valley <br /> Regional Water Quality Control Board (RWQCB) in a letter dated 31 <br /> January 2007,entitled Review of Investigation Report, LESCO,Inc, 2829 and <br /> 2935 West Washington Street, Port of Stockton, San Joaquin County. <br /> This Workplan includes the following sections: <br /> • Section 2- Background; <br /> • Section 3- Previous Site Assessment/Investigation Activities; <br /> • Section 4- Proposed Field Investigation Activities/Procedures; <br /> • Section 5-Quality Assurance/Quality Control Procedures; <br /> • Section 6- Project Reporting and Schedule; and <br /> • Section 7- References. <br /> Figures and tables immediately follow the text. <br /> ERhI 1 LESCO,A1C/0067373.1-Nov bw 2007 <br />