My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:55 AM
Creation date
6/22/2020 8:47:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r Messrs Trommer and Lawn -t <br /> Preliminary Five-Year Review Letters 16 June 2008 <br /> Page 7 of 7 <br /> Various Sites <br /> 11530 Eight Mile Road, W. �I <br /> The CUF recommended directing assessment 'and implementation of active <br /> remediation; the EHD agrees with the intent of the'recommendation, but believes <br /> that that directive should be withheld until a pending report of findings from a <br /> recently complete deep delineation investigation and a''pending SCM has been <br /> received and reviewed by the EHD. <br /> 14749 Thornton Road, N. �€ <br /> • The CUF recommended evaluation of the sampling frequency and <br /> implementation of SVE/IAS. The EHD agrees with; the recommendation; a RAP <br /> has been approved, the needed wells have beer;'installled and the remediation <br /> system is under construction. y <br /> 15615 7'r' Street, S. <br /> P <br /> • The CUF recommended implementation of active;remediation without delay; the <br /> EHD agrees with this recommendation. A favorable pumping test has been <br /> completed and reported, DPE has been approved for the site, the system has <br /> been installed and permits to operate are pending from the City and SJVUAPCD. <br /> I a3 <br /> 23569 Santa Fe Road, S.. <br /> i� <br /> • The CUF recommended termination of SVE and monitoring groundwater for one <br /> hydrological cycle. The EHD agrees with the recommendation; a work plan. to <br /> install fourteen MIP borings on and off site has been approved. <br /> 800 Main Street, E. <br /> �r <br /> • The CUF agreed with the EHD on the approved remedial'work plan. <br /> Questions.or comments should be directed to the appropriate caseworker. <br /> Sincerely, <br /> Harlin Knoll, REHS Michael lnfdrh, a, REHS <br /> Senior Registered Environmental Senior Registered Environmental <br /> Health Specialist Health Specialist <br /> 1 <br /> Nuel Henderson, PG Margaret Laq9rio, RENS <br /> Engineering Geologist Program Cooadinator <br /> l� <br /> ;i <br /> 5-Year Review Comment Letter 061608.doc <br /> e <br /> p . <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.