My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:03:32 AM
Creation date
6/22/2020 8:52:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDROGEOLOGY <br /> r, <br /> At the time of WCC's investigation in 1988, groundwater was encountered beneath the site at <br /> tF <br /> approximately 50 feet bgs within the silty clay sediments Well MW3 was installed to 50 feet <br /> bgs and wells MWi and MW2 were installed to approximately 60 feet bgs Because only two <br /> wells contained significant groundwater quantities, the hydraulic gradient could not be measured <br /> at that time <br /> During drilling in November 1992, groundwater was encountered at 80 feet bgs, :suggesting a <br /> significant drop in the local water table Because of this decrease .in groundwater elevation, <br /> shallow monitoring wells MW1, MW2, and MW3 currently c{ontain;no groundwater <br /> The static groundwater in the new monitoring wells (MW31ZMW4, MW5, and MW6) was <br /> measured at approximately 75 feet bgs, or just below the sand layer mentioned previously The <br /> hydraulic gradient was measured to be 0 003 to the northeast`using the four deeper wells on <br /> I , November 20, 1992. Figure 4 shows this most recent groundwater measurement Appendix <br /> ff B contains the surve data includin de th to water measurements relative well h I <br /> y g p a head elevations, <br /> and groundwater elevations <br /> SITE INVESTIGATION <br /> On November.18 and 19, 1992, the drilling, well installation,-and soil sampling program was <br /> performed The investigation consisted of installation of four groundwater monitoring wells, two <br /> vadose wells (VW1 and VW2), and a soil boring (B5) Wells MW3R, MW4, MW5, and MW6 <br /> {p <br /> were installed near the perimeter of the site to define the extent of groundwater contamination <br /> Well MW3R was intended to replace well MW3 which was originally installed to too shallow <br /> a depth for effective groundwater monitoring The groundwater wells were installed to greater <br /> 9i <br /> depths than initially anticipated to accommodate the deeper groundwater level Vadose wells <br /> VW1 and VW2 were installed immediately adjacent to the underground tanks to define the extent <br /> 1 - <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.