Laserfiche WebLink
GeoHydrologic Consultants, Inc <br /> • CONTENTS <br /> CERTIFICATION V <br /> 1 0 INTRODUCTION I <br />' <br /> 20 SITE DESCRIPTION l <br />' 30 SITE CHARACTERIZATION DATA 2 <br /> 3l Geology/Hydrogeology 2 <br />' 3 2 Previous Site Assessment Activities 3 <br /> 3 3 Previous Remedial Activities 5 <br /> 40 SUPPLEMENTAL HYDROGEOLOGIC INVESTIGATION 5 <br /> 1 41 Well Installation 6 <br /> 42 Soil Sampling and Analysts 7 <br /> 43 Groundwater Sampling and Analysis 7 <br /> 44 Soil Sampling Results 8 <br />' <br /> 45 Groundwater Sampling Results 8 <br /> 46 Well Development 9 <br /> 50 MULTI-PHASE EXTRACTION PILOT TESTS 9 <br /> 5 1 Multi-Phase Extraction Pilot Test (EW-5D) 10 <br />' 5 2 Multi-Phase Extraction Pilot Test(EW-5S) 12 <br /> 5 3 Hydrocarbon Mass Removal 14 <br />' 6 0 AQUIFER TESTING 15 <br /> 61 Description 15 <br /> 6 2 Collection of Groundwater Samples 17 <br />' 7 0 PUMPING TEST RESULTS 17 <br /> 7 1 Analytical Methods 17 <br />' 7 2 Pumping Well EW-5D 19 <br /> 7 3 Groundwater Results 21 <br /> 'roc 171 Pitot study Page I <br />