My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007692
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
ARCHIVED REPORTS_XR0007692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:41:12 PM
Creation date
6/23/2020 10:21:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007692
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> GeoHydrologic Consultants, Inc <br /> • 7 4 Pumping Well EW-5S 21 p g <br /> 7 5 Groundwater Results 23 <br /> 8 0 AQUIFER TEST CONCLUSIONS 23 <br /> 1 <br /> 9 0 FINAL REMEDIAL ACTION PLAN 24 <br />' 9 1 Closure Sampling 26 <br /> 9 2 Conclusions 26 <br /> 10 0 REFERENCES 27 <br />' TABLES <br />' l Soil Sample Analytical Results <br /> 2A Groundwater Data <br />' 213 Additional Groundwater Data <br /> 3 Well Completion/Development Details <br /> 4 Vacuum, Flow Rates and Concentration Data—Combined Vapor/Groundwater Extraction <br /> Pilot Test <br /> 5 Observation Well Data—Combined Vapor/Groundwater Extraction Pilot Test Data <br />' 6 Multi-Phase Extraction Test Air Analytical Data <br /> 7 Multi-Phase Extraction Test Groundwater Analytical Results <br />' 8 Combined Vapor/ Groundwater Extraction Pilot Test Mass Removal <br /> 9 Pump Test Groundwater Analytical Results <br />' 10A Summary of Drawdown/Recovery Versus Time—Pump Well (EW-5D) <br /> lOB Summary of Drawdown/Recovery Versus Time— Pump Well (EW-5S) <br />' I IASummary of Drawdown Versus Time in Observation Wells Pumping Well EW-5D <br /> I IB Summary of Drawdown Versus Time in Observation Wells Pumping Well EW-5S <br /> 1 FIGURES <br />' 1 Site Vicinity <br /> 2 Site Plan <br />' 3A Geologic Cross Section A-A' <br /> 3B Geologic Cross Section B-B' <br /> 10 4 Groundwater Elevation Contour Map <br />' TOC 171 Hot study Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.