My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 8:41:33 AM
Creation date
6/23/2020 1:43:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for GRANT LINE SHELL* as of May 12 , 2020 . <br /> Open violations from May 30, 2019 inspection <br /> Violation #103 - Failure to submit and maintain complete and current financial responsibility documents . <br /> Financial responsibility documents have been submitted to the EHD but are not found on site . Current financial <br /> responsibility documents are required to be submitted annually. Ensure a copy of the financial responsibility records <br /> are found on site . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #109 - Failed to test secondary containment, or failed to maintain test records for 36 months. <br /> Penetrattions were replaced in all product, in all UDCS , in all STP sumps and were tested on 5/24/ 18 , 7/5/ 181 <br /> 7/6/ 18 , and 7/ 12/18 and six month testing was due by november 2018 , and January 2019 . Testing has not been <br /> completed and is 4 months past due . Secondary containment testing is required six months after installation and at <br /> least every 36 months after. Immediately schedule this test and provide 48 hours notification to the EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #110 - Failed to submit "Secondary Containment Testing Report Form" within 30 days after the <br /> test. <br /> Secondary containment testing was performed on 5/24/ 18 , 7/5/ 181 7/6/ 18 and 7/ 12/ 18 . The test report were <br /> submitted to EHD on 9/28/ 18 , over three months late for the test conducted in May 2018 and over a month late for <br /> the test conducted in July 2018 . A copy of the test report must be submitted within 30 days of the testing . Ensure <br /> test results are submitted wihtin the tie frame provided by the regulations . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.