Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for GRANT LINE SHELL* as of May 12 , 2020 . <br /> Open violations from May 30 , 2019 inspection <br /> Violation #209 - Failure to conduct the designated UST operator visual inspection at least once every 30 <br /> days . <br /> The designated operator failed to document the following : <br /> On the 10/26/ 18 , 11 /21 / 18 , 12/ 19/ 18 designated operator ( DO ) inspection report under <br /> - Section III <br /> The DO failed to add a description to all the components marked N/A or N from section VII through XI . <br /> On the 1 / 17/ 19 , designated operator ( DO ) inspection report under <br /> - Section III <br /> The DO failed to add a description to all the components marked N/A or N from section VII through XL <br /> -Section VI <br /> The OWNER / OPERATOR failed to provide at least one of the following: a name , signature , and date within 48 <br /> hours of receiving the DO report under the ACKNOWLEDGMENT OF COMPLIANCE ISSUES section. <br /> On the 4/10/19 and 5/8/ 19 designated operator ( DO ) inspection report under <br /> - Section III <br /> The DO failed to add a description to all the components marked N/A or N from section VII through XI . <br /> -Section V <br /> The owner/operator failed to provide explanation of follow-up actions that will be taken for the statement provided by <br /> the DO in section lll . <br /> -Section VI <br /> The OWNER / OPERATOR failed to provide a name , signature , and date within 48 hours of receiving the DO report <br /> under the ACKNOWLEDGMENT OF COMPLIANCE ISSUES section. <br /> Furthermore the DO did not conduct an inspection with 30 days of the previous inspection . The DO inspected the <br /> facility on 1 / 17/ 19 and on 2/ 18/ 19 . The DO report was conducted 32 days after the 1 / 17/19 inspection and not within <br /> 30 days as stated by regulation . <br /> During the designated operator inspection , the designated operator shall review the alarm history for the previous <br /> month , check that each alarm was documented and responded to appropriately , and attach a copy of the alarm <br /> history with documentation taken in response to any alarms to the monthly report. Ensure that designated operators <br /> performing inspections at least once every 30 days at this facility and are including all of the required information on <br /> the reports . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #319 - No spill bucket, failed to contain 5 gallons , no means to keep it empty , or failed to be <br /> tested . <br /> The 87 Product, 89 product, and diesel product tanks UST is not equipped with spill containers that contain a <br /> minimum of 5 gallon capacity . All USTs shall be equipped with a spill container that has a minimum capacity of five <br /> gallons and a drain valve that allows drainage of the collected spill into the primary container or provide a means to <br /> keep the container empty . The spill containers listed above were tested for the 60 minute hydrostatic test with <br /> passing results , however the spill containers do not meet the five gallon requirement. Immediately contact a properly <br /> licensed , trained , and certified contractor to install an approved spill container under permit, if required , and <br /> inspection of the EHD . <br /> I <br /> Page 4 of 5 <br />