Laserfiche WebLink
m <br /> �s9 <br /> f� <br /> Coca-Cola Enterprises-West <br /> USTEC Job No. 40054.03 <br /> ' Total Petroleum Hydrocarbons 4.44 lbs/hr <br /> 4 Average Effluent Concentrations: <br /> f$ Total Petroleum Hydrocarbons 0.4 lbs/hr <br /> j ; <br /> r Physical Parameters: <br /> Stack Height 8 (ft) <br /> f Exit Velocity(8 inches) 688 ft/min <br /> 6.0 SYSTEM MONITORING AND MAINTENANCE <br /> 3 , <br /> " The remediation system will be routinely monitored to gauge the effectiveness and progress of <br /> the site remediation. This will include recording of all flow rates,pressure drops through system <br /> i components,liquid level measurements and performance of any routine,necessary,or preventive <br /> = maintenance task. The thermal oxidizer inlet and outlet,and groundwater monitoring wells will <br /> d analyzed on a routine schedule. The influent and effluent air samples should <br /> be sampled an <br /> include analysis for BTEX and CO, Brief quarterly reports will be prepared to document the <br /> t <br /> progress of the site remediation efforts. Table 6 summarizes the proposed monitoring schedule <br /> for the site. <br /> B.ised on the remediation system monitoring results, modifications to the remediation system <br /> may be necessary. Written notification of all modifications to the system will be submitted to <br /> { the Regional Water Quality Control Board(RWQCB)and the San Joaquin County Air Pollution <br /> 3 Control District. <br /> s As built drawings showing the remediation system component locations, specification and <br /> construction details will be submitted to the California Regional Water Quality Control Board, <br /> a Central Valley region, within 45 days after system installation. <br /> i <br /> 24 <br /> - i <br />