My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012663
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0012663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 4:53:26 PM
Creation date
6/23/2020 2:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012663
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br /> �s9 <br /> f� <br /> Coca-Cola Enterprises-West <br /> USTEC Job No. 40054.03 <br /> ' Total Petroleum Hydrocarbons 4.44 lbs/hr <br /> 4 Average Effluent Concentrations: <br /> f$ Total Petroleum Hydrocarbons 0.4 lbs/hr <br /> j ; <br /> r Physical Parameters: <br /> Stack Height 8 (ft) <br /> f Exit Velocity(8 inches) 688 ft/min <br /> 6.0 SYSTEM MONITORING AND MAINTENANCE <br /> 3 , <br /> " The remediation system will be routinely monitored to gauge the effectiveness and progress of <br /> the site remediation. This will include recording of all flow rates,pressure drops through system <br /> i components,liquid level measurements and performance of any routine,necessary,or preventive <br /> = maintenance task. The thermal oxidizer inlet and outlet,and groundwater monitoring wells will <br /> d analyzed on a routine schedule. The influent and effluent air samples should <br /> be sampled an <br /> include analysis for BTEX and CO, Brief quarterly reports will be prepared to document the <br /> t <br /> progress of the site remediation efforts. Table 6 summarizes the proposed monitoring schedule <br /> for the site. <br /> B.ised on the remediation system monitoring results, modifications to the remediation system <br /> may be necessary. Written notification of all modifications to the system will be submitted to <br /> { the Regional Water Quality Control Board(RWQCB)and the San Joaquin County Air Pollution <br /> 3 Control District. <br /> s As built drawings showing the remediation system component locations, specification and <br /> construction details will be submitted to the California Regional Water Quality Control Board, <br /> a Central Valley region, within 45 days after system installation. <br /> i <br /> 24 <br /> - i <br />
The URL can be used to link to this page
Your browser does not support the video tag.