My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012663
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0012663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 4:53:26 PM
Creation date
6/23/2020 2:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012663
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" s-,�s %1 _ � az -"��_ r ' ffim _�zr..'�'�. 'y F� .z�1 k Tri' <br /> � <br /> ofF : ;P r <br /> j <br /> r <br /> n <br /> Coca-Cola Enterprises -West <br /> USTEC Job No.90054.03 <br /> 7.0 PERMITTING <br /> All applicable city,county,and state permits will be obtained for the construction of the vapor <br /> extraction system. Application will be made to the San Joaquin County Air Pollution Control <br /> l <br /> } District for permits to construct and permits to operate the remediation system. <br /> E <br /> 8.0 PROPOSED REMEDIATION GUIDELINES <br /> �. USTEC proposes the following guidelines for remediation standards at the Stockton facility. The <br /> actual regulatory clea;;up standards will be established by RWQCB. The proposed remediation <br /> .-, goals are as follows: <br /> 7777777 <br /> GUIDELINE <br /> V#ATI7C i...,« „COA1'I'?�1VIINANT CONCEI�I I IiAT10NS' <br /> Soil Benzene 70 ppb <br /> ' rTPH-Gasoline 100 ppm <br /> Soil <br /> Soil TPH-Diesel 100 ppm <br /> 9.0 REMEDIATION TIME FRAME <br /> t — <br /> This section discusses the computer estimated time required to remediate the hydrocarbon <br /> contaminated unsaturated zone identified beneath the Stockton site. <br /> 9.1 REMEDIATION OF THE HYDROCARBON CONTAMINATED UNSATURATED <br /> ! ZONE <br /> _1 The computer model VENTING' was used to estimate the time that it will take the proposed <br /> 25 <br /> 1 <br /> t -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.