Laserfiche WebLink
" s-,�s %1 _ � az -"��_ r ' ffim _�zr..'�'�. 'y F� .z�1 k Tri' <br /> � <br /> ofF : ;P r <br /> j <br /> r <br /> n <br /> Coca-Cola Enterprises -West <br /> USTEC Job No.90054.03 <br /> 7.0 PERMITTING <br /> All applicable city,county,and state permits will be obtained for the construction of the vapor <br /> extraction system. Application will be made to the San Joaquin County Air Pollution Control <br /> l <br /> } District for permits to construct and permits to operate the remediation system. <br /> E <br /> 8.0 PROPOSED REMEDIATION GUIDELINES <br /> �. USTEC proposes the following guidelines for remediation standards at the Stockton facility. The <br /> actual regulatory clea;;up standards will be established by RWQCB. The proposed remediation <br /> .-, goals are as follows: <br /> 7777777 <br /> GUIDELINE <br /> V#ATI7C i...,« „COA1'I'?�1VIINANT CONCEI�I I IiAT10NS' <br /> Soil Benzene 70 ppb <br /> ' rTPH-Gasoline 100 ppm <br /> Soil <br /> Soil TPH-Diesel 100 ppm <br /> 9.0 REMEDIATION TIME FRAME <br /> t — <br /> This section discusses the computer estimated time required to remediate the hydrocarbon <br /> contaminated unsaturated zone identified beneath the Stockton site. <br /> 9.1 REMEDIATION OF THE HYDROCARBON CONTAMINATED UNSATURATED <br /> ! ZONE <br /> _1 The computer model VENTING' was used to estimate the time that it will take the proposed <br /> 25 <br /> 1 <br /> t -- <br />