Laserfiche WebLink
Working To Restore Nature <br /> Addendum One to Remedial Action Plan March 1, 1993 <br /> Coca-Cola Former Distribution Facility, Stockton, California 54006.01 <br /> ' required by the regulators, and is generally renewed on an annual basis. Final compliance <br /> monitoring requirements will be stated m the approved Permit to Operate and proposed <br /> system monitoring procedures will be modified accordingly. Plate 8 summarizes this <br /> preliminary schedule of work. <br /> ' DISTRIBUTION <br /> It is recommended that copies of this report should be forwarded to the following regulatory <br /> 4� agencies involved in this project: <br /> Mr. Michael Collins, Environmental Health Specialist <br /> San Joaquin County Public Health Service <br /> Environmental Health Division <br /> P.Q. Box 2009 <br /> E <br /> Stockton, California 95201 <br /> Ms. Beth Thayer, Water Quality Engineer <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Router Road <br /> Sacramento, California 95827-3098 <br /> 16 <br /> 1 <br />