My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007883
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0007883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:07:42 PM
Creation date
6/23/2020 3:03:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007883
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working To Restore Nature <br /> Project Status Update October 28, 1992 <br /> Coca-Cola Enterprises-West, Stockton, California 5400601 <br /> Additional future phases of the project which have been approved and funded by CCE <br /> include: <br /> o Pre-Construction Services <br /> o Construction of a Soil Remediation System <br /> o Construction Inspection and Management <br /> o Operating Instructions for the Remediation System <br /> o System Startup and Startup Monitoring <br /> o System Startup Report <br /> o Initial Operations, Maintenance, Compliance Monitoring, and Reporting <br /> Preliminary Schedule <br /> The Contract was finalized about the second week of October. RESNA is currently <br /> receiving and reviewing previous work on the site, as it is received from CCE The soil <br /> vapor extraction test (VET) is scheduled for Thursday November 12, and notification of the <br /> test has been given to the San Joaquin Valley Unified Air Pollution Control District <br /> (SJVUAPCD) The Site Safety Plan (RESNA, October 22, 1992) for the initial phases of <br /> the work has been completed. <br /> After the VET is completed, it will take about 2 - 3 weeks to receive laboratory results for <br /> the air samples. The draft Report on the Vapor Extraction Test will be submitted to CCE <br /> for their review and comment about 3 weeks after that After CCE comments have been <br /> incorporated into the report, copies of the report will be distributed to the regulatory <br /> agencies assigned to the project. <br /> After reviewing all previous work and completing the Report on the Vapor Extraction Test, <br /> Addendum No. 1 to the Remedial Action Plan will be prepared. The Addendum will <br /> describe the proposed work and the proposed remediation system, and present a schedule <br /> of work for the project A draft of this report will be sent to CCE for their review and <br /> comment, finalized, and then copies will be distributed to the regulatory agencies <br /> The preparation of engineering Plans and Specifications is expected to take about 5 to 6 <br /> weeks. Permit applications will be prepared concurrently with the engineering design work <br /> The SJVUAPCD Permit to Construct and Permit to Operate is estimated to take the Air <br /> District about 2 to 3 months to approve. City permits are estimated to take the City about <br /> 1 to 2 months to approve. <br />• <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.