Laserfiche WebLink
0705686SV.doc <br /> October 10,2007 <br /> Page 3 of 3 <br /> 6. Vehicles necessary for work may be parked in State Highway right of way off paved <br /> shoulders. Auxiliary support and employee vehicles shall remain outside the right of <br /> way. <br /> 7. Permittee shall provide for the safe passage of pedestrians. <br /> 8. THIS PERMIT AUTHORIZES WORK ON CONVENTIONAL HIGHWAYS ONLY. <br /> The State of California, Department of Transportation makes no assurance or <br /> expressed warranty that the plans are completed or that the planned construction fits <br /> field conditions. Should additional work or modifications of the work be required in order <br /> to meet established Department Standards or in order to fit field conditions, the work <br /> shall be performed by Permittee as directed by the State's Inspector. <br /> IPermittee shall fully conform to the requirements of the Caltrans statewide NPDES <br /> Storm Water Permit, Order No. 99-06-DWQ, NPDES No. CAS000003, adopted by <br /> the State Water Resources Control Board on July 15, 1999. The Permittee shall <br /> also conform to the requirements of the General NPDES Permit for construction <br /> Activities and any subsequent General Permit in effect at the time of issuance of this <br /> Encroachment Permit. These permits regulate storm water discharges associated with <br /> year-round construction or special event encroachment activities. <br /> For all projects of 1 acre (0.405 ha) or more the Permittee shall develop, implement, <br /> and maintain a Storm Water Pollution Prevention Plan (SWPPP) and for projects less <br /> than 1 acre (0.405 ha) a Water Pollution Control Program (WPCP). Either the Plan <br /> or Program shall also conform to the requirements of the Caltrans Storm Water Quality <br /> Handbook, Construction Contractor's Guide and Specifications and Caltrans <br /> Specification Section 7-1-.01 G and subsequent revisions. <br /> 1 <br /> 3 <br /> 1 <br />