My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011574
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
ARCHIVED REPORTS_XR0011574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:46:49 PM
Creation date
6/23/2020 3:42:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011574
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The soil cuttings generated during drilling activities will be placed into Department <br /> of Transportation-approved 55-gallon waste barrels for temporary storage at the site Water <br /> generated during drilling decontammation, well development, and well purging (prior to <br /> groundwater sampling)will also be placed into waste barrels <br /> Waste barrels containing the soil cuttings or water will be labeled with the project <br /> name,project number,boring number,matrix type (e g , soil), date of generation, and depth interval <br /> (for soil cuttings) All disposable health and safety gear worn during field activities will be placed <br /> into 55-gallon waste barrels Arrangements for disposal will be the responsibility of CPL <br /> 4.10 Health and Safety <br /> A site-specific Health and Safety Plan and descriptions of the chemical and <br /> physical properties of the chemicals of concern are provided In Appendices B and C, <br /> respectively During field activities, personnel will wear modified Level D health and safety <br /> personal protective equipment(consisting of hard hats, gloves, safety glasses, and steel-toed boots) <br /> TyveV suits may be worn for protection against potentially impacted soils and groundwater If <br /> necessary, health and safety protection may be upgraded to Leve! C The upgrade will depend on <br /> the PID readings obtained during drilling <br /> On-site health and safety Issues will be the responsibility of the Project Manager <br /> and the Site Health and Safety Officer Daily health and safety tailgate meetings will be <br /> conducted by the Site Health and Safety Officer to inform all field personnel of current on-site <br /> health and safety issues <br /> Preliminary Site Investigation Work Plan-Draft June 30, 1998 <br /> Roberts Property(Former Vemalis Pump Station) <br /> Vemahs,California <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.