Laserfiche WebLink
• • Approach changes in grade squarely to avoid shifting loads or unexpected <br /> weighing, <br /> • Use a spotter (person at grade) to provide guidance when vertical and <br /> lateral clearance is questionable, <br /> • Secure all loads to ng prior to moving the drill ng, <br /> + Locate overhead and buried utilities prior to beginning operations, <br /> i <br /> • Treat overhead electrical lines as if they were energized, <br /> • Contact appropriate utilities agency to manipulate and deactivate overhead <br /> service in areas that interfere with drilling operations Do not attempt to <br /> handle utilities, <br /> • Contact appropriate utilities agency to survey, mark, and flag locations of <br /> buried utility lines, <br /> • Maintain orderly housekeeping on and around the drill ng, <br /> • Store tools, materials, and supplies to allow safe handling by drill crew <br /> members Proper storage on racks or sills will prevent spreading, rolling, <br /> or sliding, <br /> • Avoid storage or transportation of tools, materials, or supplies within or on <br /> the drill ng derrick, <br /> • Maintain working surfaces free of obstructions or potentially hazardous <br /> substances, <br /> • Store gasoline only in containers specifically designed and approved for <br /> such use, <br />�' • Establish a communication system between ng operator, helper, and <br /> geologist for responsibilities during drilling operations, and <br /> • Avoid the removal of soil cuttings with hand <br /> f <br /> 6-4 <br /> t , <br />