Laserfiche WebLink
I <br /> Wash hands and face and proceed to the SZ <br /> t be full decontaminated after each use All project personnel are <br /> Respirators mus y <br /> required to take a thorough soap and water shower at the end of each work day If monitoring or <br /> a general exposure assessment indicates that an employee has become contaminated, notify <br /> Radian's site health and safety officer <br /> w <br /> 9.2.2 Equipment Decontamination <br /> i <br /> All equipment leaving the EZ must be decontanunated either within the CRZ or at <br /> the central decontamination area Small equipment such as hand tools will be thoroughly <br /> decontaminated within the CRZ before being placed in the SZ Personnel performing <br /> decontamination shall wear the appropriate level of PPE (refer to Section 7 0) and must follow <br /> approved protocol outlined in the Site Investigation Work Plan <br /> I <br /> High pressure/temperature water cleaning will be performed on the larger <br /> equipment (such as those used during drilling operations) The drilling rig may be grossly <br /> decontaminated before moving out of the EZ to decrease contamination in the CRZ Except for <br /> small pieces of sampling equipment decontaminated within the CRZ, all other equipment will be <br /> secured in plastic in the EZ and transported to the central decontamination area for appropriate <br /> decontamination Personnel performing high pressure/temperature cleaning shall wear at a <br /> minimum <br /> Safety glasses with side shields, <br /> • Chemical-resistantlwater-resistant safety boots, or safety boots with <br /> chemical-resistant/water-resistant boot covers, <br /> • Nitnle outer gloves, <br /> • Disposable TyveO and air-purifying respirator if deemed necessary by the <br /> SHSO <br /> 9-3 <br />