My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011574
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
ARCHIVED REPORTS_XR0011574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:46:49 PM
Creation date
6/23/2020 3:42:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011574
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• control points for the any support equipment while the CRZ diminishes the possibility of moving <br /> contaminants to a formerly uncontaminated area Once work commences, no outside personnel <br /> will be allowed into the exclusion zone without appropriate gear and proof of health and safety <br /> training certificates <br /> i <br /> 9.2 Decontamination Procedures <br /> Decontamination of personnel is expected to take place during the daily <br /> I <br /> operations of the system as the personnel will not be potentially exposed to the contaminants <br /> Emergency decontamination of personnel will take place to prevent the spread of contamination <br /> into clean zones, as well as to reduce exposure to personnel and the environment <br /> 9.2.1 Personnel Decontamination <br /> iPersons leaving the EZ must first follow decontamination procedures in the CRZ <br /> Hand tools and other sampling equipment used in the EZ and reusable PPE (boots, safety <br /> glasses, etc ), will be cleaned prior to removal from the site each day The step-by-step sequence <br /> for personnel decontamination is as follows <br /> + Remove boot covers (if used) at the boot-washing station and place them <br /> in the disposal container provided, <br /> • Wash outer gloves and chemical resistant boots (if used) at the boot- <br /> washing station, <br /> • Remove wrist tape (if used) and outer gloves, and place them in the <br /> disposal container provided, <br /> + Remove ankle tape (if used) and disposable coveralls (if used) and place <br /> them in the disposal container provided, <br /> • Remove respirators (if used) and place each in designated locations in the <br /> CRZ, <br /> • Remove inner gloves and place them in the disposal container provided, <br /> and <br /> 9-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.