Laserfiche WebLink
10.3 Lines of Authority-, Personnel Roles and Communication <br /> The lines of authority and responsibilities for emergency action will coincide with <br /> the health and safety responsibilities discussed in the HASP The Project Manager has overall <br /> authority for implementation of this ERP and all site emergency actions <br /> 10.4 Emergency Phone Numbers <br /> Table 10-1 is the listing of emergency telephone numbers and agencies <br /> Specific roles and responsibilities to be carried out by site personnel will directly <br /> correlate to the nature of the incident Radian site workers will be utilized to carry out the <br /> various response (or non-response) operations <br /> Communications during site emergencies will include the following <br /> • Site communications using alarms and radios, and <br /> • Off-site communications with local health and emergency response <br /> agencies, via telephones <br /> Once the situation has been evaluated, local emergency response agencies will be <br /> notified, as necessary, via the telephone A telephone shall be available to the SHSO Specific <br /> protocol, as to who is to be notified in the event of a site emergency, is presented in the <br /> emergency alerting provisions of this ERP <br /> 10-2 <br />