My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
0
>
2900 - Site Mitigation Program
>
PR0515450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 6:26:41 PM
Creation date
6/23/2020 3:50:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515450
PE
2960
FACILITY_ID
FA0012153
FACILITY_NAME
SOUTH SHORE PARCEL
STREET_NUMBER
0
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
WEBER AVE
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Study Outline - 2 - 3 November 2005 <br /> III. Contaminant Fate and Transport <br /> A. Contaminant Properties <br /> 1. Mobility <br /> 2. Toxicity <br /> 3. Half-life <br /> 4. Chemical and biological degradation <br /> B. Contaminant Transport based on Soil and Aquifer Properties <br /> IV. Remedial Action Objectives <br /> V. Description of Remedial Action Alternatives—at a minimum, 3 alternatives must be considered <br /> A. Alternative that meets background levels <br /> B. Alternative that meets water quality objectives <br /> C. Alternative that meets levels between background and water quality objectives <br /> VI. Evaluation of Remedial Action Alternatives <br /> A. Overall Protectiveness of Human Health and the Environment <br /> B. Compliance with Laws and Regulations <br /> C. Long Term Effectiveness and Permanence <br /> D. Reduction of Toxicity, Mobility, and Volume <br /> E. Short Term Effectiveness <br /> F. Implementability <br /> G. Cost <br /> F. State and Community Acceptance <br /> VII. Potential Impacts of Remedial Actions <br /> VIII. Estimated Project Schedule for Each Alternative <br /> IX. Preferred Alternative <br />
The URL can be used to link to this page
Your browser does not support the video tag.