My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
0
>
2900 - Site Mitigation Program
>
PR0515450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 6:26:41 PM
Creation date
6/23/2020 3:50:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515450
PE
2960
FACILITY_ID
FA0012153
FACILITY_NAME
SOUTH SHORE PARCEL
STREET_NUMBER
0
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
WEBER AVE
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the REDEVELOPMENT AGENCY with recommended changes; or(b) modify the document as <br /> deemed necessary and approve the document as modified. <br /> 3.4 Notices and Submittals. All notices, documents and communications required to <br /> be given under this Agreement, unless otherwise specified herein, shall be sent to the respective <br /> parties at the following addresses in a manner that produces a record of the sending of the notice, <br /> document or communication such as certified mail, overnight delivery service, facsimile <br /> transmission or courier hand delivery service: <br /> To the WATER BOARD: <br /> Antonia Vorster <br /> Attention: Mary Serra, Project Manager <br /> 11020 Sun Center Drive, Ste. 200 <br /> Rancho Cordova, CA 95670 <br /> (916) 464-4682 Fax(209) Fax(916)464-4797 <br /> mserra@waterboards.ca.gov <br /> To the REDEVELOPMENT AGENCY: <br /> Steve Pinkerton, Director <br /> Attn: Kitty Walker, Project Manager <br /> Redevelopment Department <br /> City of Stockton <br /> 425 N. El Dorado Street <br /> Stockton, CA 95202 <br /> (209) 937-8811 Fax(209) 937-5099 <br /> Kitty.Walker@ci.stockton.ca.us <br /> 3.5 Endangerment During Implementation. In the event WATER BOARD <br /> determines that any activity (whether or not pursued in compliance with this Agreement) may <br /> pose an imminent or substantial endangerment to the health and safety of people on the Site or in <br /> the surrounding area or to the environment, the REDEVELOPMENT AGENCY, through its <br /> employees, agents and, or, assigns shall stop further implementation of this Agreement for such <br /> period of time as may be needed to abate the endangerment. <br /> 3.6 Cost Estimates and Payment. Pursuant to H&SC section 33459.4, the <br /> REDEVELOPMENT AGENCY agrees to pay all costs incurred by WATER BOARD in <br /> providing oversight pursuant to this Agreement, including review of the documents described in <br /> Exhibit C and associated documents. An estimate of WATER BOARD's oversight costs for <br /> activities conducted through June 30, 2006 are stated in Exhibit D: Central Valley Regional <br /> Water Quality Control Board: Cost Estimate for Morton-Alco Remediation Project an <br /> attachment incorporated herein by this reference. Cost estimates shall include all labor, <br /> materials, and expenses incurred by WATER BOARD in performing the services contemplated <br /> by this Oversight Agreement. Future cost estimates will be provided annually in compliance with <br /> Water Code section 13365. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.