Laserfiche WebLink
Starrtec <br /> 2010 TIDEWATER STOCKTON WORK PLAN <br /> 3.3.6 Task 6 - Data Analysis and Reporting <br /> The data collected through the implementation of this work plan will be included in a results <br /> report following completion of all field work and receipt of all analytical data. The report will <br /> include the following: <br /> • Tabulated TPE and GWE system operating parameters; <br /> • The TPE and GWE equipment specifications; <br /> • Boring logs; <br /> • Laboratory analytical reports; <br /> • Tabulated groundwater chemical concentrations; <br /> • Tabulated soil vapor chemical mass removal estimates based on FID readings; <br /> • Estimation of total chemical mass removal and chemical mass removal rates over the <br /> entire pilot study; <br /> • Groundwater extraction rates; <br /> • Post test groundwater elevation recovery rates and analysis; <br /> • Waste management records; and <br /> • Summary and assessment of the performance of TPE and GWE on the recovery wells. <br /> 3.15 <br />