Laserfiche WebLink
Stantec <br /> 2010 TIDEWATER STOCKTON WORK PLAN <br /> 4.0 Report of Findings and Recommendations <br /> The results of the SPH assessment, well installations, and aquifer testing activities proposed in <br /> this work plan will be presented in a report to follow completion of all field activities and receipt <br /> of all analytical data. The results of the work proposed in this work plan will also include <br /> assessment of the GCT groundwater production rate and chemical properties with an <br /> implementation plan for ongoing extraction activities from the GCT at the UOU. <br /> 4.16 <br />