Laserfiche WebLink
Stantec <br /> 2010 TIDEWATER STOCKTON WORK PLAN <br /> 5.0 LIMITATIONS <br /> This work plan was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the Site. It was <br /> prepared for the exclusive use of ConocoPhillips Company and Chevron EMC for the express <br /> purpose stated above. Any re-use of this report for a different purpose or by others not <br /> identified above shall be at the user's sole risk without liability to Stantec. To the extent that this <br /> work plan is based on information provided to Stantec by third parties, Stantec may have made <br /> efforts to verify this third party information, but Stantec cannot guarantee the completeness or <br /> accuracy of this information. The opinions expressed and data collected are based on the <br /> conditions of the Site existing at the time. No other warranties, expressed or implied are made <br /> by Stantec. <br /> 5.17 <br />