My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
0
>
2900 - Site Mitigation Program
>
PR0515450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 5:41:19 PM
Creation date
6/23/2020 3:52:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515450
PE
2960
FACILITY_ID
FA0012153
FACILITY_NAME
SOUTH SHORE PARCEL
STREET_NUMBER
0
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
WEBER AVE
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> 2010 TIDEWATER STOCKTON WORK PLAN <br /> • Dissolved metals by EPA 6000/7000 Series (during first and third quarters only per the <br /> MRP) <br /> 2.2 SEPARATE PHASE HYDROCARBONS <br /> Sheen or measurable SPH were observed in 24 of a possible 76 wells throughout the Site in <br /> 2009. Sheen and SPH product were found in the DPE well area on the L&M OU, and north of <br /> West Weber Avenue in the Waterfront Towers parking lot, where deep B-Zone wells MW-43, <br /> MW-48, and MW-49 are located. Additional product was consistently measured on the northern <br /> section of the L&M OU just south of West Weber Avenue near shallow monitoring wells MW-9, <br /> and DPE-13 and deep monitoring wells MW-17, MW-54, and MW-55. <br /> During the most recent quarter, fourth quarter 2009, measurable SPH or SPH-sheen was <br /> observed in eight B-Zone wells. SPH thicknesses for deep B-Zone wells are summarized <br /> below. <br /> Well Identification SPH Thickness <br /> feet <br /> MW-17 Sheen <br /> MW-43 0.24 <br /> MW-46 Sheen <br /> MW-47 Sheen <br /> MW-48 0.01 <br /> MW-49 0.86 <br /> MW-50 29.19 <br /> MW-52 0.02 <br /> SPH removal activities are scheduled to be conducted quarterly (at a minimum) for on and off <br /> Site wells which repeatedly contain measurable thickness of SPH. <br /> 2.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.