Laserfiche WebLink
Appendix D Direct Push Bonng Investigation <br /> Phase II ESA Multi-Modal Station `Six-Block Project" <br /> January 6,2003 <br /> Page 8 of 15 <br /> ■ Detection borings DBK5-829-1 and DBK5-829-2 were advanced using a Geoprobe <br /> 5400/5410 drill rig with four-foot rods These borings were thus advanced to a depth of 44 <br /> feet bgs instead of 45 feet bgs <br /> ■ Detection boring DBK5-829-3 was advanced to 40 feet bgs using a Geoprobe 5400 dn11 rig <br /> with four-foot rods The boring collapsed prior to installation of the temporary well screen <br /> and consequently,no groundwater sample was collected <br /> ➢ Two Geoprobe borings (GBK5-843-1 and GBK5-843-2) and two detection borings (DBK5-843-1 <br /> and DBK5-843-2) were installed in the parking area of 843 E Weber Avenue, an auto body <br /> repair shop <br /> ■ No groundwater samples were collected from detection borings DBK5-843-1 and DBK5- <br /> 843-2 Access to this property (843 E Weber Avenue) was terminated by the property <br /> owner's legal council subsequent to the advancement of these borings but before groundwater <br /> elevation data and groundwater samples could be collected Access to the property was <br /> granted three days after the advancement of the borings for purposes of grouting the open <br /> boreholes <br /> No visual or PID indications of contamination were noted during the investigation activities at Block 5 <br /> 3 3.7 Block 6 <br /> From May 28 to May 29, 2002, five Geoprobe borings and four detection borings were installed on three <br /> parcels of Block 6 Geoprobe, detection, and hydropunch boring locations for Block 5 is presented in <br /> Figure 11, Appendix A <br /> ➢ One detection boring(DBK6-128-1) was installed at 128 N Aurora, a paved parking area <br /> ➢ Two Geoprobe borings (GBK6-915-1 and GBK6-915-2) and one detection boring (DBK6-915-1) <br /> were installed inside the building at 915 E Weber Avenue, an auto body repair shop <br /> ■ Detection boring DBK6-915-1 met refusal at a depth of 20 feet bgs and therefore, <br /> groundwater samples were not collected <br /> ➢ Three Geoprobe borings (GBK6-931-1 through GBK6-931-3) and two detection bonngs (DBK6- <br /> 931-1 and DBK6-931-2) were installed at 931 E Weber Avenue <br /> ■ Detection boring DBK6-931-1 was installed in the parking area comprising the southern <br /> portion of the property and the remaining borings were installed inside the building <br /> occupying the northern portion of the property <br /> o A strong odor and elevated PU) readings were noted at GBK6-931-1, the first Geoprobe <br /> boring advanced inside of the building located at 931 E Weber Avenue The boring <br /> location was selected to correspond to an existing hole in the concrete floor in the <br /> northwest comer of the building The impacted soil did not appear to be widespread as no <br /> indication of contamination was observed in the adjacent borings GBK6-931-2 and <br /> GBK6-931-3, located approximately six and 20 feet away from GBK6-931-1, <br /> respectively <br />