Laserfiche WebLink
k <br /> Phase l Environmental Site Assessment <br /> City of Stockton Multi-Modal Station/Shopping Center <br /> " Page 4 <br /> practically reviewable In other words, when so much data is generated that it cannot be feasibly reviewed <br /> for its impact on the property, it is not practically reviewable <br /> 7, 1 0 <br /> ASTM 3 3 29 Publicly available —Information that is publicly available means that the source of the <br /> information allows access to the information by anyone upon request <br /> 1 <br /> ASTM 3 3 30 Reasonably ascertainable — For purposes of both this practice and Practice E 1528, <br /> information that is (1)publicly available, (2) obtainable from its source within reasonable tune and cost <br /> constraints, and(3)practically reviewable <br /> ASTM 3 3 43 Visually and/or physically observed— During a site visit pursuant to Practice E 1528, or <br /> r pursuant to this practice, this term means observations made by vision while walking through a property <br /> and the structures located on it and observations made by the sense of smell, particularly observations of <br /> noxious or foul odors The term "walking through" is not meant to imply that disabled persons who <br /> cannot physically walk may not conduct a site visit, they may do so by the means at their disposal for <br /> moving through the property and the structures located on it <br /> . <br /> 14 LIMITATIONS AND EXCEPTIONS <br /> Condor performed this environmental assessment in accordance with the guidelines set forth in the ASTM <br /> E 1527-00 Standard Practice for Environmental Site Assessments Phase I Environmental Site <br /> Assessment Process This ASTM Phase I ESA is thorough, but it is not intended to identify all potential <br /> concerns or to eliminate all risk of the subject property(ies) bearing some degree of environmental <br /> Itability Condor cannot, and will not, warrant or certify that the site is free of contaminants because it is <br /> impossible to know if such a condition exists Although risks can never be eliminated, more detailed and <br /> extensive investigations yield more information <br /> The scope of this project was presented in our proposal and contract number 2993 dated September 8, <br /> 2000 and subsequently approved by the client on December 13, 2000 The scope of work for this report is <br /> intended to provide an appropriate inquiry into the previous ownership and uses of the property to satisfy <br /> the innocent landowner defense to CERCLA liability The scope of work for this project was limited to a <br /> A qualitative evaluation of environmental concerns associated with the potential presence of hazardous <br /> materials in conjunction with current and previous activities on the site and did not include other services <br /> that are not described in this report Specifically excluded from the scope of work are (1)the evaluation of <br /> the site for the presence of asbestos, radon, and lead-based paint, (2) a survey of the site for wetlands or <br /> rare and endangered species, (3) a survey of the site for historical or cultural resources, and (4) research <br /> into the title history of the site The site reconnaissance of the site was incomplete due to limited access to <br /> 4t some commercial properties and denied access to some commercial properties Residences were not <br /> included in the site reconnaissance .interviews were not conducted with all property owners or managers <br /> Condor has completed the ASTM Phase I ESA, as an environmental professional, in accordance with the <br /> ASTM guidelines and with the customary state of the practice and the prevailing standard of care for <br /> completing such assessinents in California at this time Condor shall not be subject to any express or <br /> implied warranties whatsoever <br /> The property owner is solely responsible for notifying all governmental agencies and the public at large of <br /> the existence, release,treatment, or disposal of any hazardous materials observed at the site, either before <br /> or during performance of Condor's services Condor assumes no responsibility or liability whatsoever for <br /> any claim, loss of property value, damage, or injury which results from pre-existing hazardous materials <br /> being encountered or present on the site, or from the discovery of such hazardous materials Client shall <br /> notify property owners of their reporting requirements <br /> v <br /> i <br /> t� CONDOR <br />