Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br />Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br />Tank ID <br />1 -Regular 87 <br />2 -Diesel <br />3 -Regular 87 <br />4 -Diesel <br />Tank Manufacturer <br />Arrow Tank <br />Arrow Tank <br />Ameron FRP <br />Ameron FRP <br />Tank Capacity <br />10K <br />10K <br />8:29 <br />8:27 <br />Test Start Time <br />8:25 <br />8:35 <br />5 Psi <br />5 Psi <br />Initial Reading <br />-10" Hg. <br />-10" Hg. <br />9:29 <br />9:27 <br />Test End Time <br />9:25 <br />9:35 <br />5 Psi <br />5 Psi <br />Final Reading <br />-10" Hg. <br />-10" Hg. <br />0 Psi <br />0 Psi <br />Change in Reading <br />0 <br />0 <br />No Loss <br />No Loss <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />Tightness Test Results <br />® Pass ❑ Fail <br />I ® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />I ❑ Pass ❑ Fail <br />7. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Pipe Run ID <br />1 -Regular 87 <br />2 -Diesel <br />3 -Regular 87 <br />4 -Diesel <br />Pipe Manufacturer <br />Ameron FRP <br />Ameron FRP <br />Ameron FRP <br />Ameron FRP <br />Test Start Time <br />8:22 <br />8:24 <br />8:29 <br />8:27 <br />Initial Reading <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time <br />9:22 <br />9:24 <br />9:29 <br />9:27 <br />Final Reading <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Change in Reading <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />No Loss <br />No Loss <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />