My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:39:57 PM
Creation date
6/23/2020 4:36:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC TEST <br />Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID <br />1 -87 -PS <br />2 -Diesel -PS <br />Sump Manufacturer <br />Unknown FGC <br />Unknown FGC <br />Sump Depth (inches) <br />48" <br />44 1/2" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />14" <br />16" <br />Test Start Time <br />8:30 <br />8:42 <br />Initial Reading <br />.001 <br />.001 <br />Test End Time <br />9:00 <br />9:12 <br />Final Reading <br />.001 <br />.001 <br />Change in Reading <br />0 <br />0 <br />Pass/Fail Criteria <br />> .002 <br />> .002 <br />Tightness Test Results <br />M Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Sump/UDC ID <br />UDC 1&2 <br />UCD 3&4 <br />Sump Manufacturer <br />Total Cont. <br />Total Cont. <br />Sump Depth (inches) <br />29" <br />33" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />9" <br />12" <br />Test Start Time <br />8:52 <br />9:14 <br />Initial Reading <br />.001 <br />.001 <br />Test End Time <br />9:22 <br />9:44 <br />Final Reading <br />.001 <br />.001 <br />Change in Reading <br />0 <br />0 <br />Pass/Fail Criteria <br />> .002 <br />> .002 <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.