Laserfiche WebLink
Company Name: <br />Inspected by: <br />Environment otection Division • Certified UnijieA. 1grain Agency <br />Address: <br />Date: <br />Refer to Title 19, 22, & 23 of the California Code of Regulations (CCR), Chapters 6.5, 6.7, 6.67, & 6.95 of the Health and Safety Code (CHSC). The following Code selections <br />are either in Violation (V) of, or in Compliance (C). or compliance is Not Annlicable (N). <br />HAZARDOUS WASTE TREATMENT FACILITY INSPECTION REPORT <br />ALL:'HAZARDOUSWASTE TREATMENT'1t'ACILITIES" < <br />NARRATIVE/COMMENTS <br />1. Submit notification form and plot plan/map 60 days before hazardous <br />CHSC 25200.3 <br />waste treatment begins. <br />CHSC 25201.5 <br />CCR 67450.2(b) <br />CCR 67450.2(b) <br />CHSC 25200.3(e)(3) <br />2. Correctly identify all generator information on the notification form. <br />CHSC 25201.5(d)(7) <br />CHSC 25201.14(c)(2) <br />CHSC 25144.6(c)(6) <br />CHSC 25200.3(k) <br />3. Amend the notification to reflect changes from the latest forms submitted. <br />CHSC 25201.5(i) <br />CCR 67450.3(c)(4) <br />CHSC 25201.5(c) <br />4. The treatment technology is authorized. <br />CHSC 25200.3(b)(3) <br />CCR 67450.3(c)(4) <br />CONDITIONALLY EXEMPT ; u�'�' .. N rMr�� <br />1. Prepare and maintain written operating instructions and a record of the <br />CHSC 25201.5(d)(3) <br />dates, amounts, and types of waste treated for 3 years. <br />CHSC 25201.5(d)(5) <br />2. Prepare and maintain a written inspection schedule and log of inspections <br />CHSC 25201.5(d)(4) <br />conducted for 3 years. <br />CHSC 25201.5(d)(5) <br />3. Remove or decontaminate all waste residues and systems, soils, etc. <br />contaminated with hazardous waste and provide written notification upon <br />CHSC 25201.5(d)(8) <br />com letion of all activities. <br />4. Ancillary equipment of tanks or containers treating hazardous waste must <br />CHSC 25201.5(e) <br />be tested every two years if there is not secondary containment. <br />CCR 66265.191 <br />BOTH CONDITIONALLY ADTHOIUZED/PERMTT-BY RULE <br />1. Hazardous Waste Treatment Area Control: <br />CCR 66265.17(a) <br />■ Sign posted "Danger Hazardous Waste Area - Keep Out" <br />CCR 67450.3(c)(9)(A) <br />• Access to entry point controlled at all times <br />CHSC 25200.3(c)(1) <br />2. Complete the Tiered Permitting Phase I Environmental Assessment <br />CHSC 25200.14(a)(1) <br />Checklist (DTSC form 1151). <br />CHSC 25200.3(c)(3) <br />3. Submit financial assurance (when required) for closure and a Certification <br />CHSC 25245.4(b)(1)(B) <br />of Financial Assurance form. <br />CCR 67450.13(a) <br />4. Adjust the closure cost estimate for inflation by March of each year. <br />CCR 67450.13(a)(2) <br />CONDITIONALi,YAUTtIQWZEV'ONI Y'",' <br />1. Certify annually that a program has been established to reduce the volume <br />CHSC 25200.3(c)(2)or <br />quantity and toxicity of hazardous waste to the degree deemed <br />CHSC 25202.9 <br />economical) practicable b the generator. <br />CHSC 25200.3(cX4) <br />2. Maintain the hazardous waste area containment system to be free of cracks <br />CCR 66264.175(a) <br />or gaps, and be impervious to leaks, spills, and accumulated precipitation. <br />CCR 66264.115(b)(1) <br />3. Remove spills, leaks, or accumulated precipitation from containment area <br />CHSC 25200.3(c)(4) <br />in a timely manner. <br />CCR 66264.175(b)(5) <br />4. Ancillary equipment, without secondary containment, must be integrity <br />CHSC 25200.3(c)(4)(A) <br />tested every two years. <br />CCR 66265.191 <br />5. Prepare and maintain a written inspection schedule and a log of inspections <br />CCR 66262.34(d)(2) <br />conducted. <br />6. Treat only hazardous waste generated onsite. <br />CHSC 25200.3(c)(8) <br />PBR ONLY,-, <br />" <br />1. Label exterior of each FTU. <br />CCR 67450.3(c)(7) <br />2. Provide the waste analysis plan {CCR 66265.13(b)). <br />CCR 674503(cx8)(A) <br />3. Provide written inspection schedule (CCR 66265.15(b)). <br />CCR 67450.3(cx8)(B) <br />4. Provide a co2y of the closure plan {CCR 67450.3(c)(I 1)(13)). <br />CCR 67450.3(c)(8)(G) <br />5. Failure to prepare/submit annual re ort requested by CUPA. <br />CCR 67450.3(c)(10) <br />CLOSURE REQUIREMENTS FOR <br />6. Failure to remove hazardous waste within 90 days of treating the final <br />CCR 67450.3(c)(l1)(D) <br />volume. <br />7. Failure to complete closure activities within 180 days of final hazardous <br />CCR 67450.3(c)(I 1)(E) <br />waste removal. <br />8. Failure to notify the CUPA 15 da s before the completion of closure. <br />CCR 67450.3(c)(l 1)(F) <br />9. Failure to submit a closure certification signed by the o/o and a P.E. <br />CCR 67450.3(c)(I 1)(G) <br />Number of TP on file: <br />FTU's On-site during inspection: <br />PBR CA - CESW _ CESQT _ CEL- CE -CL- TOTAL _ <br />PBR _ CA- CESW _ CESQT _ CEL_ CE -CL -TOTAL- <br />