Laserfiche WebLink
El <br />C <br />HAL WASTE GENERATOR <br />CONDMONAL EXEMPTION <br />CONDMONAL AUTHORIZATION <br />PERNHT BY RULE <br />TMNTU) <br />Closure Plan <br />No written closure plan is required <br />No written closure plan required unless a specified 90 day <br />No written closure plan required unless a <br />Title 22 CCR 67450.3(a)(13)(B)-TTU <br />unless one or more of the <br />generator requirement applies. <br />specified 90 day generator requirement <br />Title 22 CCR 67450.3(c)(11)(B)-FTU <br />following specified 90 day <br />applies. <br />Closure plan requirements. The plan <br />generator requirements applies: <br />must be kept onsite and does not have <br />Title 22 CCR 66265.197(x) <br />to be approved by CUPA or DTSC. <br />90 day accumulation tanks and <br />Title 22 CCR 67450.3(a)(13)(C)-TTU <br />containers without secondary <br />containment are subject to closure <br />Title 22 CCR 67450.3(c)(1 1)(Q -FTU <br />plan requirements specified in <br />TTU - O/O shall amend the closure plan <br />Article 7 of Chapter 15. <br />at any time during the active life of the <br />Title 22 CCR 66265.445(c)(1)(A) <br />TTU(s) when changes in operating <br />Drip pads (w/o liners) from wood <br />plans or TTU design affect the closure <br />treatment facilities are subject to <br />plan, or whenever there is a change in <br />closure plan requirements. <br />the expected year of closure. <br />Title 22 CCR 66265.1102(a)�rU <br />- Amendments to the closure plan <br />Containment building are subject <br />must comply with Section 66265.112(c). <br />to closure plan requirements. <br />Closure Time <br />Requirements <br />& Notification <br />Notification of closure may be <br />required by some local ordinances. <br />Same as generator requirements plus: <br />H&SC 25201.5(d)(8)(A) <br />Same as generator requirements plus: <br />H&SC 25200.3(g)(1) <br />Title 22 CCR 67450.3(a)(13)(D)-TTU <br />Title 22 CCR 67450.3(c)(11)(D)-FTU <br />O/O shall treat, remove or dispose of all <br />Upon terminating operations, the generator shall initiate closure <br />Upon terminating operations, the generator <br />hazardous waste within 90 days after <br />activities by removing all waste residues. <br />shall initiate closure activities by removing <br />final volume is treated. <br />all waste residues. <br />---------------- <br />------ <br />Title 22 CCR 67450.3(a)(13)(E)-TTU <br />--- -- -- — <br />------ ---- <br />H&SC 25201.5(d)(8)(B) <br />H&SC 25200.3(g)(2) <br />Title 22 CCR 67450.3(c)(11)(E)-FTU <br />Requires generator to provide written notification to DTSC and <br />Requires generator to provide written <br />Closure shall be completed within 180 <br />the CUPA or the authorized unified program agency upon the <br />notification to DTSC and the CUPA or the <br />days after treating final volume of <br />completion of all closure activities. <br />authorized unified program agency upon the <br />hazardous waste. <br />completion of all closure activities. <br />----- <br />Title 22 CCR 67450.3(a)(13)(F)-TTU <br />Title 22 CCR 67450.3(c)(11)(F)-FTU <br />O/O shall notify CUPA (and DTSC for <br />TTUs) or authorized UP agency 15 <br />days prior to completion of closure. <br />