My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1550
>
2231-2238 – Tiered Permitting Program
>
PR0507006
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 9:57:33 AM
Creation date
6/23/2020 6:36:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0507006
PE
2233
FACILITY_ID
FA0007213
FACILITY_NAME
PEARL CROP INC
STREET_NUMBER
1550
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3929
APN
177-290-05
CURRENT_STATUS
02
SITE_LOCATION
1550 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\TP\TP_2233_PR0507006_1550 INDUSTRIAL_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZINC PHOSPHATE FILTER CAKE PRESS <br /> PACIFIC PRESS <br /> PAC 470 SERIES <br /> CLOSING THE PRESS <br /> o Push the follower plate tight against all the other plates. <br /> o Flip down the hydraulic cylinder into place. <br /> o Turn the control lever to the"left"position to start the hydraulic pump pumping. <br /> o The follower will close slowly. Once the follower has pushed all the filter plates <br /> against the head,the hydraulic pump will start cycling slower until it comes to a stop. <br /> FILTRATION CYCLE <br /> o Open all valves,except the`Slowdown Air Line Valve." <br /> o Start the Wilden Diaphragm Pump. <br /> o Start the air pressure and slowly increase it to 25 psi. Once the diaphragm pump <br /> strokes have slowed to only a few times per minute, it is necessary to increase pump <br /> pressure. Increase the air pressure to 50 psi. The filter cycle is complete when a <br /> pressure of 100 psi is reached and the air diaphragm pump strokes less than four <br /> times per minute. <br /> AIR BLOWDOWN <br /> o Close all valves to the press. <br /> o Open the lower left "Air Blowdown Manifest Valve." <br /> o Slowly open the`Slowdown Air Line Valve"to at least 30-40 psi. <br /> o The air is to be left on for approximately 30 minutes to aid in drying the filter cake. <br /> CAKE DISCHARGE <br /> o Turn off the"Blowdown"Air Line Valve." <br /> o Turn the control lever to the"right"position to start the hydraulic pump pumping. <br /> The follower will slowly open and allow access to the inside of the plates. <br /> o Flip up the hydraulic cylinder. <br /> o Pull apart each filter plate, one at a time. <br /> o Use a plastic spatula to separate the filter cake from the filter plate. <br /> o Filter cake will fall through the chute and into a cardboard bin. <br /> STOWI-0006 Wastewater Filter Cake and Zinc Phosphate Filter Cake filter press disposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.