Laserfiche WebLink
May 2, 2005 <br />HEALTH AND SAFETY PLAN <br />UST SYSTEM INSTALLATION <br />2494 E. FREMONT STREET <br />STOCKTON, CALIFORNIA <br />This Health and Safety Plan (HSP) delineates the basic safety requirements for the UST System <br />Installation at the property located at 2494 E. Fremont Street, Stockton, California. The installation <br />work includes the operation of heavy equipment such as an excavator, crane, backhoe and skid <br />loader and small equipment such as a jackhammer and concrete saw. Work at the site consists of <br />excavation in the area of the new tanks and piping, installation of tanks, piping, electrical conduits, <br />backfilling and concrete work. <br />The provisions set forth in this HSP will apply to all employees of Walton Engineering, Inc. <br />(Walton) and all other contractors/subcontractors working on this project. The <br />contractors/subcontractors may elect to modify these provisions, but only to upgrade or increase the <br />safety requirements, and only with the concurrence of Walton, as designated and accepted in writing. <br />This HSP addresses the expected potential hazards that may be encountered for this project. Field <br />activities are planned to begin in May 2005, with the duration estimated at approximately five weeks. <br />If changes in site or working conditions occur as the activities progress, addenda to this HSP will be <br />provided by Walton. <br />Walton employee responsible for the project safety is the Project Manager. The Health and Safety <br />Coordinator is responsible for the overall Health and Safety Program of Walton and may choose to <br />audit any site for compliance and take appropriate action to correct deficiencies. The Project <br />Manager is responsible for implementing the provisions of this HSP, providing a copy of this HSP to <br />the field personnel, and advising personnel involved in site activities on health and safety matters. <br />The Project Manager has the authority to audit site activities for compliance with the provisions of <br />this HSP and may suspend or modify work practices or dismiss subcontractors whose conduct does <br />not meet the requirements specified in this HSP. <br />The Project Manager is responsible for the dissemination of the information contained in this HSP to <br />Walton personnel assigned to the project, and to the responsible representative of each <br />contractor/subcontractor firm working with Walton on the project. The Project Manager will act as <br />the Site Safety Officer. As such, the Project Manager is responsible for adequately addressing the <br />following items: <br />XXXX Street West Sacramento, California 95691 (XXX) xxx-xxxx <br />Walton 077-013.hsp November 9, 1998 <br />