Laserfiche WebLink
Appendix A <br />Health and Safety Plan <br />• Safety supplies and equipment inventory onsite <br />• Training programs and hazard communication <br />• Procedures for reporting accidents or incidents <br />The Project Manager has the authority to suspend work any time he or she finds that the provisions <br />of the HSP are inadequate for worker safety. <br />SAFETY AND ORIENTATION MEETINGS <br />Field personnel from Walton and its contractors/subcontractors will attend aproject specific training <br />meeting for safety issues and review the project tasks before beginning work. The meeting will be <br />led by the Project Manager. <br />HAZARDOUS MATERIALS PRESENT <br />Previous soil investigation work at the site has shown that the site's subsurface soil and groundwater <br />are not contaminated with gasoline or benzene. <br />IN no a DI T1.111 ITWITU��� <br />Project activities will be conducted in accordance with the following minimum safety requirements: <br />Eating, drinking, and smoking will be restricted to a designated area. The Project Manager will be <br />responsible for taking necessary steps to protect employees from physical hazards, including: <br />• Falling objects, such as tools or equipment <br />• Falls from elevations <br />• Tripping over hoses, pipes, tools, or equipment <br />• Slipping on wet or oily surfaces <br />• Insufficient or faulty protective equipment <br />• Insufficient or faulty equipment or tools <br />PROTECTIVE EQUIPMENT REQUIREMENTS <br />Field personnel and visitors are required to wear the following clothing and equipment, as a <br />minimum, while in the work area of the project site: <br />• Long pants <br />• Safety glasses <br />• Shirt <br />• Leather work boots <br />Walton Engineering <br />Walton 077-013.hsp 2 <br />