My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2300 - Underground Storage Tank Program
>
PR0231104
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:08:21 PM
Creation date
6/23/2020 6:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231104
PE
2351
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
01
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2494\PR0231104\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br />Health and Safety Plan <br />• Safety supplies and equipment inventory onsite <br />• Training programs and hazard communication <br />• Procedures for reporting accidents or incidents <br />The Project Manager has the authority to suspend work any time he or she finds that the provisions <br />of the HSP are inadequate for worker safety. <br />SAFETY AND ORIENTATION MEETINGS <br />Field personnel from Walton and its contractors/subcontractors will attend aproject specific training <br />meeting for safety issues and review the project tasks before beginning work. The meeting will be <br />led by the Project Manager. <br />HAZARDOUS MATERIALS PRESENT <br />Previous soil investigation work at the site has shown that the site's subsurface soil and groundwater <br />are not contaminated with gasoline or benzene. <br />IN no a DI T1.111 ITWITU��� <br />Project activities will be conducted in accordance with the following minimum safety requirements: <br />Eating, drinking, and smoking will be restricted to a designated area. The Project Manager will be <br />responsible for taking necessary steps to protect employees from physical hazards, including: <br />• Falling objects, such as tools or equipment <br />• Falls from elevations <br />• Tripping over hoses, pipes, tools, or equipment <br />• Slipping on wet or oily surfaces <br />• Insufficient or faulty protective equipment <br />• Insufficient or faulty equipment or tools <br />PROTECTIVE EQUIPMENT REQUIREMENTS <br />Field personnel and visitors are required to wear the following clothing and equipment, as a <br />minimum, while in the work area of the project site: <br />• Long pants <br />• Safety glasses <br />• Shirt <br />• Leather work boots <br />Walton Engineering <br />Walton 077-013.hsp 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.