Laserfiche WebLink
-, H L:.. <br />A 1, t' i8 t i 1: c i' a F. I . E V t. r "r i4 1, a. • h K Y 1 R is N hi L N 'I ; I. s r P Y t, 9� <br />,canstcaINC, <br />111'.Rarar;Ff.t'li:lr:liluvirnar PralUau.Get94914-1110 7ileplwnr `=0%'i 765-1(6 l.r,in;:.'r: (1'r"64T9fiN <br />John'W johnx.n <br />November 9, 2004 <br />C,o PresUmit <br />_..rrhiterr <br />13lueline Technologies <br />265 Bums I7ttivo <br />Yuba City, CA 95991 <br />itian F..Lira . <br />C6-f4�Ume <br />ATT: Brian Henry <br />rtrrbirrer <br />RE: STATE REGISTERED PROFESSIONAL ENGINEER APPROVAL <br />johwo. Hic6s <br />CCR Title 23 Division 3, Chapter 1, Section 2631(d) Secondary Containment <br />Wm Pnwk& rr <br />BLIiELIM 7ptel pylon 11DUSING for double wall penetration Mugs. <br />C ertl IL Spencer <br />l have examined and reviewed the following items or. BUT -1 -INE TECHNOLO IES% "Z, Nylon <br />por prwid of <br />Housings Cur use with Bluclinc penetration Pittings on underground single or double wall secondary <br />sumps. <br />mx�opwl 0-- V- <br />I . Du Pont Product Information Zytel 70G MIS I I. BK031 Glass Reinforced Black 66 Resin. (2) <br />)'eaite R. M k i.►. <br />Ray )K Pedro <br />2. Bluclinc Technologies AB248I VERSION FOR California Installs 20(14 Kwik Pit. Installation <br />Alan K. Shimabukaro <br />instructions. 911104 (8) <br />)0110 W 5ttom <br />3. Blueline "Fechnotogies Ku ik-Fit Installation Instructions 20'14/04 (pages 27.28 &s 30). <br />Blythe R. Wilmn <br />4. Pctronaeal Secondary Containment Sealant Application Properties (3) <br />5. MSD Petro Scal SBS Part A (5) <br />6. MSD Petro -Scat tins Part 11 (5 ) <br />7. PetroSeal Secondary Cortontaitunent Sealant (3 1) <br />8. CA Professional Engineer's approval letter dated 10.23?02 for application of Petro -Sc=at in <br />sealing of secondary containment entry fittings by Gerald Wayne Carson PL 2879 <br />Ofj=crs <br />ANArtt4tat, CA <br />BuricvuL. WA <br />C:AMAsr WA <br />laai nNtz, CA <br />Pt'rrh±+ MA. CA <br />k0suwLLE. CA <br />St'onsjmt.s. AZ <br />WN.p4Wjll.J�i!pF�#.CYIgF <br />9. Inspected sample housings. Removed an installed housing and inspected the Petr cal and the: <br />Pellethane gasket in each housing. <br />Upon review of the materials and construction it is my opinion and conc=lusion that sound <br />engineering design and engineering of these products will provide liquid and vapor tight seals far the <br />sec{mdary containment penrltations for petroleum installations. <br />Jamcs H. Ray <br />Sr Civil E.nginecr <br />C <br />(;.'R'IVIt.'ur1SFA11TV-nl I.i^ !NF Ikiwi.,1.1 W.,Iar <br />