My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2300 - Underground Storage Tank Program
>
PR0231104
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:08:21 PM
Creation date
6/23/2020 6:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231104
PE
2351
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
01
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2494\PR0231104\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging I SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com ptete the followinactocklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No* Was accuracy of system product level readings tested? <br /> Yes No* Was accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> Yes IWere all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): El Check this box if LLDs are not installed. <br /> Complete the followina checklist: <br /> • Yes No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Checkaff <br /> N/A that apply) Simulated leak rate: x 3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. <br /> • Yes No* Were all LLDs confirmed operational and accurate within regulatoryrequirements? <br /> x Yes No* Was the testing apparatus properly calibrated? I <br /> Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> • Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> • Yes No* For electronic LI-Ds, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> • Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> • Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.