My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:53:15 AM
Creation date
6/23/2020 6:40:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dynamic Back Pressure Test <br /> Allorda®TV$ 416 2nd Street ❑ TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TEST DATE: 10-05-18 TIME: UST ® AST ❑ <br /> TECHNICIAN NAME' <br /> SITE NAME: KNIFE RIVER CONSTRUCTION ❑ PT ❑ Startup Test ® Compliance Test <br /> FELIX RAMIREZ <br /> Address:665 W CLAY ST <br /> AGFNCY- <br /> City: STOCKTON,CA 95206 1 declare, under penalty of perjury under the laws of the state <br /> of California that based on information and belief formed Inspector: <br /> Phone: after reasonable inquiry, the statements and information <br /> provided in the document are true,accurate,and complete. Present <br /> Contact: ❑ Not Present <br /> _ <br /> Confirmation# TECH SIGNATURE: <br /> Permit or Facility# <br /> #DISPENSERS :]:A DISPENSER Make: NOZZLE Make: PV Valve Make: <br /> #TOTAL NOZZLES 1 Model: Model: I Model: <br /> MANIFOLDED Yes ® No❑ BALANCE ® ASSIST ❑ Assist Type: <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 Initial pressure before testing- " we <br /> #Nozzles per Tank 1 <br /> EQUIPMENT <br /> Actual Tank Capacity Decay: Blockage: <br /> Gasoline Volume <br /> Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(Capacity minus Volume) <br /> Magnehelic Guage ❑ Magnehelic Guage ❑ <br /> Phase I System Type:2pt EVR Coaxial EVR <br /> Digital Manometer ❑ I Digital Manometer ❑ <br /> Initial Test Pressure(Inches water)2i0 2,0 Equipment Calibration Date: <br /> Drift Check End Value: <br /> PSI 1 Minute(Inches water) 2'0 Nitrogen Intro.Point: <br /> PSI @ 2 Minutes 2.0 <br /> PSI @ 3 Minutes Allowable Fill Time 2 scfm 1 MIN <br /> 2.0 <br /> PSI @ 4 Minutes 2.0 Time l: <br /> Final Pressure @ 5 Minutes(Inches water) 2.0 Time 2: <br /> Allowable Final Pressure(CARB) 1.95 Time 3: <br /> Liquid Removal Check,Dynamic Back <br /> Pressure(if due),and Parts& <br /> _______ ------- <br /> PASS Re airs Are Listed on Pa a 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.