My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1993-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 2:06:24 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1994
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1993-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL LEAK DETECTOR TEST CERTIFICATION <br />EXXON STATION : RECEIVED <br />Address: rA-7()5 Cci->,+ \/ CW WC <br />City/StateMp: F-E—B 15 1993 <br />Test Date <br />!�E7-�-Z <br />Product STP Manufacturer Leak Detector Manufacturer/Model SerWWJH I Pass/Fai1* <br />RUL Y\ <br />PLUS l (l0ht-::i rJ`l Existing: r`rr!C:i' d UD `J Gpc'o I�15S <br />SUP <br />DSL New: / <br />OTHIZ-- <br />Comments: <br />Product <br />RUL <br />PLUS �Y _ <br />SUP <br />DSL <br />OTS <br />Comments: . <br />Product <br />RUL <br />PLUS <br />SUP <br />DSL <br />OTS_ <br />Comments: <br />Product <br />RUL <br />PLUS ` <br />SUP <br />DSL= <br />OTER <br />Comments: <br />STP Manufacturer <br />STP Manufacturer <br />Leak Detector Manufacturer/Model Serial # Pass/Fail* <br />Ezistingi: lr� l' . + / Q � � PC <br />New: / <br />Leak Detector Manufacturer/Model <br />Existing: `_lam/ DLD <br />New: / <br />STP Manufacturer Leak Detector Manafacturer/Model <br />Existing: / <br />New: / <br />Serial # Pass/Faii* <br />311 E)C4 P6 S'S <br />Serial # Pass/Fail* <br />* All Units that do not have a leak detector or fail should receive a new XLP (use XLDs in instances of excessive static <br />head). Al new units must pass test. If an operational leak detector restricts flow through the product line, or if the d4 twtor <br />will not pass a test, shut the product down immediately. Perform a line test to verify system integrity. <br />If the product lines are tested - Products that fail should be shut down immediately. Notify the station operator o pis <br />action and call the Dispatcher immediately to notify. Attach all test results to this form when submitting to Exxon. <br />rl-ICA. <br />Ccs ► �-� <br />Contractor Name 1 �eshnic�m%iaine <br />I <br />Address/City/St Wchmcian SignaturODate <br />
The URL can be used to link to this page
Your browser does not support the video tag.